Construction
The deck and pier were built in the spring of '05. The construction of the enclosure was begun in mid-fall of '05. I thought it would take 6 weeks but winter set in early and the project took 6 months! The octogonal area is 9 ft. flat to flat. Attached to the back is the control room area which is about 7x7 ft.

Deck Frame 
Basic Framework 
Basic Framework 
Basic Framework 
Wood Siding And Trim 
Insulated Control Room 
Lexan Door 
Pier With Shelving For Equipment 
Pier Base Isolated From Deck 
Roof Frame 
2" Foam Panels Installed and Glassed 
Epoxy Coating Applied 
Roof Rail Lift Motors 
Lift Motors Installed 
Lift Limit Switches 
Custom Roof Rollers (6) 
Roof Roller On Rail 
Roof Rollers Installed 
1/15th hp Roof Motor And Chain Drive 
Roof Motor With Lexan Rain Guard 
Chain Drive Detail 
Roof Closed 
Roof Open 
View Through Doorway 
OBS With Nice Sunset 
New Siding To Match House 
The Wood Siding Was Too Much Maintainance