The deck and pier were built in the spring of '05. The construction of the enclosure was begun in mid-fall of '05. I thought it would take 6 weeks but winter set in early and the project took 6 months! The octogonal area is 9 ft. flat to flat. Attached to the back is the control room area which is about 7x7 ft.
Home Equipment Construction Contact CarbonScopeTubes.com PublicMissiles.com
Deck Frame Basic Framework Basic Framework Basic Framework
Deck Frame Basic Framework Basic Framework Basic Framework
Wood Siding And Trim Insulated Control Room Lexan Door Pier With Shelving For Equipment
Wood Siding And Trim Insulated Control Room Lexan Door Pier With Shelving For Equipment
Pier Base Isolated From Deck Roof Frame 2" Foam Panels Installed and Glassed Epoxy Coating Applied
Pier Base Isolated From Deck Roof Frame 2" Foam Panels Installed and Glassed Epoxy Coating Applied
Roof Rail Lift Motors Lift Motors Installed Lift Limit Switches Custom Roof Rollers (6)
Roof Rail Lift Motors Lift Motors Installed Lift Limit Switches Custom Roof Rollers (6)
Roof Roller On Rail Roof Rollers Installed 1/15th hp Roof Motor And Chain Drive Roof Motor With Lexan Rain Guard
Roof Roller On Rail Roof Rollers Installed 1/15th hp Roof Motor And Chain Drive Roof Motor With Lexan Rain Guard
Chain Drive Detail Roof Closed Roof Open View Through Doorway
Chain Drive Detail Roof Closed Roof Open View Through Doorway
OBS With Nice Sunset New Siding To Match House The Wood Siding Was Too Much Maintainance
OBS With Nice Sunset New Siding To Match House The Wood Siding Was Too Much Maintainance